All Greenville zoning districts
R-M12 zoning in Greenville County
Multifamily Residential District, Unincorporated Greenville County
R-M12 allows single-family homes by right on lots of at least 7,500 square feet, up to 12 homes per acre. Apartments are allowed by right.
- Minimum lot
- 7,500 sf
- Density limit
- 12 per acre
- Front setback
- 20 ft
- Height limit
- 45 ft
What a parcel in R-M12 holds
| Parcel | Single-family lots | Apartments by density |
|---|---|---|
| 2 acres | 8 | 24 |
| 5 acres | 21 | 60 |
| 10 acres | 43 | 120 |
| 20 acres | 87 | 240 |
A clean parcel with no flood zone or wetland, with 25% of the land kept for streets and open space. Lots are the lower of the minimum lot size count and the density limit. A real parcel loses more to its shape, hazards, and frontage. Screen a real parcel for its count.
Uses
| Use | Status | Source |
|---|---|---|
| Single-family homes | By right | Table 6.1 (row: Dwelling - single-family detached) |
| Apartments | By right | Sec. 5:6Table 6.1 also shows P for Dwelling - multiple-family in R-M2 to R-M20. Apartments need a 2-acre minimum lot (Sec. 5:6.5-1). |
Limits
| Limit | Value | Source and notes |
|---|---|---|
| Minimum lot size | 7,500 sf | Table 7.1Conventional single-family detached lot minimum (Table 7.1). Single-family attached lots: 1,800 sf. No minimum lot size under the Open Space option; density is capped by the district (R-M number = units per acre). |
| Minimum lot width | 30 ft | Sec. 7:3.9Sec. 7:3.9 sets the single-family lot width in multifamily districts (Table 7.3 points to it). Lot width is "the distance between the side lot lines at the front setback line" (Art. 3 definition, Lot, Width), i.e. at the building line. |
| Density limit | 12 per acre | Sec. 5:6.5-1Density equals the number in the district name (R-M12 = 12 units per acre). Sec. 5:6 sets the range from 2 (R-M2) to 20 (R-M20). |
| Dwellings per lot | None | The county ordinance sets density per acre. |
| Front setback | 20 ft | Table 7.3Value is for a residential service street; 30 ft on a collector and 50 ft on an arterial. Measured from the right-of-way; if unknown, measured from pavement edge and increased 10 ft (Sec. 7:3). |
| Side setback | 25 ft | Table 7.3Multifamily buildings. Single-family dwellings in multifamily districts use 5 ft side and rear (Sec. 7:3.9). |
| Rear setback | 25 ft | Table 7.3Multifamily buildings. Single-family dwellings use 5 ft (Sec. 7:3.9). |
| Front setback, single-family | 20 ft | Sec. 7:3.9Residential street; 30 ft on a collector and 50 ft on an arterial. Same as the district front setback in Table 7.3. |
| Side setback, single-family | 5 ft | Sec. 7:3.9Single-family dwellings only; the district side setback for other uses is 25 ft (Table 7.3). |
| Rear setback, single-family | 5 ft | Sec. 7:3.9Single-family dwellings only; the district rear setback for other uses is 25 ft (Table 7.3). |
| Height limit | 45 ft | Table 7.3Sec. 7:3.7 lets buildings exceed the district height if side and rear yards increase 1 foot for each 3 feet of extra height. |
| Story limit | None | The County Zoning Ordinance regulates height in feet only; no story limit found in Table 7.3/7.4. |
| Lot coverage limit | None | No maximum lot coverage standard for this district found in Articles 5 and 7 of the County Zoning Ordinance; site yield is set by setbacks, parking, buffers and stormwater. |
| Floor area ratio limit | None | The County Zoning Ordinance has no floor area ratio standard (searched the full text). |
| Parking per apartment | 1.5 spaces | Table 12.1, item 4Bedroom-based: 1 space per 1-BR or efficiency, 1.5 per 2-BR, 2 per 3+ BR, plus visitor parking equal to 10% of required spaces. 1.5 is the 2-BR ratio; compute from the unit mix. Structures of four units or fewer: 1.5 per unit. |
Screen a parcel zoned R-M12
Search an address or parcel number. The screen loads the parcel, finds its district, removes setbacks, flood zones, and wetlands, and counts lots and apartments with these limits.
Other Greenville County districts
Limits from the Greenville County Zoning Ordinance, read November 20, 2026. Source document. Ordinances change and overlays can add limits. Confirm the district and its limits with Greenville County Zoning Administration before you rely on them.